The renovation: how an old Appenzell house became Haus 104

From March to September 2026 we hollowed out the house, which is more than 300 years old, and built it up again. We enjoyed it very much and put our hearts into it.

Chapter 1 · March 2026

The house as we bought it

When we bought the house, it was in good but old condition. There was no heating. In the parlour stood a green tiled stove that had to keep the whole house warm. The upper floors must have been pretty cold in winter. Some ceilings were only 1.75 metres high.

Chapter 2 · April 2026

What appeared behind the walls

Behind the panelling we found old wallpaper, layer after layer. There were flowery borders and patterns in blue and gold, and underneath, newspaper with old advertisements was stuck to the wall. These finds gave us the idea to hang wallpaper in the new rooms too. It recalls the time when the textile industry was widespread in the region.

Chapter 3 · April 2026

Down to the wooden walls

Then we hollowed the house out down to its old wooden walls. We didn't throw away the beams that came out. Today they panel one wall each in the Bläss and Vech rooms.

Chapter 4 · May 2026

The cellar goes deeper

To make the rooms higher, we had to go down. With a small digger we lowered the cellar by 30 to 40 centimetres. That let us put in all the floors again. Today the rooms are 1.90 metres high, which is a lot for an Appenzell house.

Chapter 5 · End of May 2026

The attic opens up

For the Senne Suite we opened up the attic and took out the side walls. After that we had to put new supports under the whole roof. Now you could see from the floor all the way up to the ridge.

Chapter 6 · June to August 2026

Building it back up

Then came the rebuilding. We insulated the house all round, added sound insulation between the rooms and put in everything needed for fire safety. The floors now have underfloor heating, powered by a heat pump.

Chapter 7 · September 2026

Almost there

In September the walls were white, the new staircase was in, and the first reclaimed wood wall was up. The house is modern again and has still remained an Appenzell house.

Chapter 8 · From December 2026

Finished

We'll show you photos of the finished rooms here from December.

We'll show you photos of the finished rooms here from December.

A skip of old timber, with the hills and the Alpstein behindHaus 104 at the crossroads

A skip of old timber, with the hills and the Alpstein behind

Something for Schwellbrunn

At the crossroads you can see the house from two sides, and for a long time it looked rather run-down. We're glad we could give something back to the village with this renovation.

See Haus 104